How much data-center power each lab is bringing online, who supplies it, and the load on the grids where the sites are.

Data-center power per lab

Epoch AI’s estimate, for sites where Epoch names the lab a confident or likely user.

15,453 MW across 99 sites, 16.2M H100-equivalents, as of Epoch’s data on .

Estimated data-center power per lab, by Epoch AI’s named users
Lab Power H100-equivalents Sites sharedLargest
Anthropic2,833 MW2.86M7 (1)Colossus 2, Anthropic-Amazon New Carlisle, Colossus 1
Meta2,335 MW2.59M16Meta Prometheus, Meta-QTS Hillsboro 2, Meta Rosemount
OpenAI2,293 MW2.69M12 (3)OpenAI Stargate Abilene, Microsoft Fairwater Atlanta, Microsoft Fairwater Wisconsin
xAI1,263 MW1.49M2 (1)Colossus 2, xAI QTS Atlanta
Alibaba169 MW31.9K1Alibaba Zhangbei
Mistral31 MW34.9K2Mistral Bruyères-le-Châtel, EcoDataCenter 2
Google: no site counted
Epoch AI, AI data centersCC BY 4.0, Epoch AI

Who powers the lab sites

The utility, generator, equipment maker or site host for each lab site. Planned is Epoch’s furthest estimate.

Listed companies tied to the power of data-center sites used by a frontier lab
Ticker Company Role Labs Sites Where
WECWEC Energy GroupUtility, GenerationOpenAI2Microsoft Fairwater Wisconsin, OpenAI Stargate Wisconsin
AEPAmerican Electric PowerUtilityAnthropic1Anthropic-Amazon New Carlisle
BEBloom EnergyEquipmentOpenAI1OpenAI Stargate New Mexico
CIFRCipher DigitalSite hostAnthropic1Anthropic Barber Lake
CORZCore ScientificSite hostOpenAI1CoreWeave Denton TX
DTEDTE EnergyUtilityOpenAI1OpenAI Stargate Michigan
ETREntergyUtilityMeta1Meta Hyperion
GEVGE VernovaEquipmentOpenAI1OpenAI Stargate Abilene
PNWPinnacle West CapitalUtilityOpenAI1Microsoft Goodyear
WMBWilliamsGenerationMeta1Meta Prometheus
WULFTeraWulfSite hostAnthropic1Anthropic Lake Mariner
Each utility, generator, equipment maker and site host read for a lab’s data-center site, with the page and the quote it rests on
Site Labs Now Planned Role Company Stated by the pageSource
Colossus 2Anthropic, xAI1,246 MW2,395 MW by Mar 5 2027—No power company read yet—
Anthropic-Amazon New CarlisleAnthropic1,037 MW2,310 MW by Mar 17 2028Utility

Indiana Michigan Power (American Electric Power) AEP

“Indiana Michigan Power (I&M), an American Electric Power (Nasdaq: AEP) company, has filed a joint settlement with the Indiana Office of Utility Consumer Counselor (OUCC), Amazon Web Services (AWS)”

aep.com
OpenAI Stargate AbileneOpenAI824 MW—Grid

ERCOT

“The Abilene data center connects directly to the ERCOT grid, allowing us to primarily draw from the region's robust and growing supply of renewable energy.”

crusoe.ai
OpenAI Stargate AbileneOpenAI824 MW—Generation

Abilene DC 1 (Crusoe and Blue Owl joint venture) (private)

“The Company was formed for the purpose of owning, developing, leasing, and operating a data center campus located in Abilene, Texas (the “Investment”), which is comprised of two buildings each containing four data halls, and a power station.”

sec.gov
OpenAI Stargate AbileneOpenAI824 MW—Site host

Lancium (private)

“While the Investment is leased to a tenant, the tenant will be responsible for making monthly payments for power directly to Lancium.”

sec.gov
OpenAI Stargate AbileneOpenAI824 MW—Generation

Crusoe (private)

“To ensure uninterrupted reliability and support grid stability for this critical AI infrastructure, we've strategically installed advanced natural gas turbines from GE Vernova.”

crusoe.ai
OpenAI Stargate AbileneOpenAI824 MW—Equipment

GE Vernova GEV

“has been sourcing high-efficiency natural gas turbines from GE Vernova to provide this stability. Last December, the company ordered 10 LM2500XPRESS aeroderivative gas turbines to be installed at the data center it’s building outside of Abilene.”

gevernova.com
OpenAI Stargate AbileneOpenAI824 MW—Site host

Lancium (private)

“In addition to the 1.2 GW grid interconnection, Lancium’s power plan for the site includes large-scale behind-the-meter battery storage and solar resources”

1,200 MWGrid interconnection for the campuscrusoe.ai
OpenAI Stargate AbileneOpenAI824 MW—Site host

Lancium (private)

“Our Abilene campus features a 1.2GW interconnect, which has been fully approved by ERCOT and undergone a rigorous, formal review process in collaboration with transmission service providers.”

1,200 MWGrid interconnection for the campuslancium.com
Microsoft Fairwater AtlantaOpenAI636 MW——No power company read yet—
Meta PrometheusMeta471 MW1,328 MW by Jul 1 2028Generation

Will-Power OH (Williams) WMB

“Will-Power OH, LLC will construct and operate the power plant on 20 acres within the New Albany International Business Park, and Sidecat, an affiliate of Meta Platforms, Inc., will consume the power.”

200 MWCapacity of one Socrates plantcontent.govdelivery.com
Meta PrometheusMeta471 MW1,328 MW by Jul 1 2028Generation

Will-Power OH (Williams) WMB

“Will-Power’s proposed Socrates North and South projects are advanced power generation facilities in New Albany, Ohio, spanning approximately 20 acres each. The project involves two separate power generation sites, with a combined generating capacity of 400 megawatts”

400 MWCapacity of the two Socrates plants togetherwilliams.com
Microsoft Fairwater WisconsinOpenAI369 MW2,715 MW by May 13 2028Utility

We Energies (WEC Energy Group) WEC

“And our partnership with WE Energies ensures we will continually explore and add energy transmission, generation, and usage — under transparent tariffs that support grid reliability.”

blogs.microsoft.com
Colossus 1Anthropic340 MW——No power company read yet—
CoreWeave Denton TXOpenAI262 MW395 MW by May 31 2027Site host

Core Scientific CORZ

“The 70 MW of additional contracted power at the Denton site increases the full critical IT load to approximately 260 MW. The agreement increases CoreWeave’s total contracted HPC infrastructure with Core Scientific to approximately 590 MW across six sites.”

260 MWCritical IT load CoreWeave has contractedinvestors.corescientific.com
CoreWeave Denton TXOpenAI262 MW395 MW by May 31 2027Site host

Core Scientific CORZ

“Under the original agreement, Core Scientific leased approximately 31 acres of city-owned land and had access to 297 megawatts (MW) of power. The Denton City Council's approval increases the leased land to approximately 78 acres and the Company's access to power to 394 MW.”

394 MWPower Core Scientific can draw under its city agreementsinvestors.corescientific.com
Anthropic Lake MarinerAnthropic210 MW441 MW by Mar 31 2027Grid

NYISO

“The Lake Mariner Data Campus sources power from the NYISO Zone A grid, which is characterized by low-cost, low-carbon energy.”

sec.gov
Anthropic Lake MarinerAnthropic210 MW441 MW by Mar 31 2027Site host

TeraWulf WULF

“with approximately 500 MW of aggregate gross capacity expected to be energized by early 2027, and planned expansion to approximately 750 MW, supported by an approved NYISO System Impact Study”

500 MWCampus capacity expected to be energized by early 2027sec.gov
Anthropic Lake MarinerAnthropic210 MW441 MW by Mar 31 2027Utility

New York Power Authority (state power authority)

“Of the campus’s total power needs, 90 MW is allocated under an agreement with the New York Power Authority (“NYPA”) executed in February 2022”

90 MWPower allocated under a 2022 agreementsec.gov
Anthropic Lake MarinerAnthropic210 MW441 MW by Mar 31 2027Site host

TeraWulf WULF

“Under the Akela Fluidstack Leases, we will provide 378 MW of critical IT load at the Lake Mariner Data Campus.”

378 MWCritical IT load leased to Fluidstacksec.gov
Microsoft GoodyearOpenAI202 MW—Utility

Arizona Public Service (Pinnacle West Capital) PNW

“In Jan. 2022, we announced the need for a new double circuit 230kV power line to serve the Microsoft data center. The new 230kV line would connect the APS Runway Substation,”

aps.com
Meta-QTS Hillsboro 2Meta180 MW——No power company read yet—
Meta JeffersonvilleMeta178 MW——No power company read yet—
Meta RosemountMeta178 MW——No power company read yet—
Meta TempleMeta178 MW——No power company read yet—
Alibaba ZhangbeiAlibaba169 MW——No power company read yet—
Meta MontgomeryMeta153 MW465 MW by Feb 23 2027—No power company read yet—
Meta CheyenneMeta152 MW249 MW by Feb 15 2027—No power company read yet—
Meta KunaMeta152 MW——No power company read yet—
Meta HuntsvilleMeta146 MW——No power company read yet—
Meta Eagle MountainMeta133 MW——No power company read yet—
Meta AikenMeta129 MW——No power company read yet—
Meta Los LunasMeta118 MW273 MW by Jan 1 2028—No power company read yet—
Meta GallatinMeta87 MW——No power company read yet—
Meta SarpyMeta80 MW——No power company read yet—
Mistral Bruyères-le-ChâtelMistral31 MW——No power company read yet—
xAI QTS AtlantaxAI17 MW——No power company read yet—
Meta HyperionMeta0 MW2,786 MW by Dec 31 2029Utility

Entergy Louisiana (Entergy) ETR

“Entergy Louisiana is pleased to announce plans to invest in modern, efficient generation facilities and robust transmission infrastructure to support the region and Meta’s data center representing a $10 billion in investment in Richland Parish.”

opportunitylouisiana.gov
OpenAI Stargate New MexicoOpenAI0 MW2,450 MW by Dec 31 2028Equipment

Bloom Energy BE

“Project Jupiter in New Mexico, part of Bloom’s expanded partnership with Oracle, will be powered by up to 2.45 GW of Bloom fuel cell capacity.”

2,450 MWFuel cell capacity, up tobloomenergy.com
OpenAI Stargate MichiganOpenAI0 MW1,383 MW by Dec 31 2028Utility

DTE Electric (DTE Energy) DTE

“DTE negotiated its first hyperscale data center contracts to provide 1.4 gigawatts of load to power Oracle’s new data center in Saline Township, MI”

1,400 MWLoad under DTE’s data-center contractssec.gov
OpenAI Stargate WisconsinOpenAI0 MW1,300 MW by Dec 31 2028Utility

We Energies (WEC Energy Group) WEC

“Additionally, Vantage Data Centers is developing a large data center campus in Port Washington that is forecasted to add 1.3 GWs of demand through 2031.”

1,300 MWDemand WEC forecasts the campus adds through 2031sec.gov
OpenAI Stargate WisconsinOpenAI0 MW1,300 MW by Dec 31 2028Utility

American Transmission Company (WEC Energy Group) WEC

“In September 2025, ATC filed an application for a CPCN with the PSCW to construct the Ozaukee County Distribution Interconnection Project. This proposed project is an important part of our plan to serve the data center under construction in Port Washington, Wisconsin”

sec.gov
OpenAI Stargate WisconsinOpenAI0 MW1,300 MW by Dec 31 2028Utility

We Energies (WEC Energy Group) WEC

“Vantage is underwriting 100% of the power infrastructure investment with a dedicated electricity rate from WEC Energy Group utility We Energies.”

vantage-dc.com
OpenAI Stargate WisconsinOpenAI0 MW1,300 MW by Dec 31 2028Generation

WEC Energy Group WEC

“said Scott Lauber, president and CEO, WEC Energy Group. “Together with Vantage, we are adding nearly two gigawatts of new energy to the grid, 30% of which will be dedicated to the homes, farms and other businesses we serve today.”

vantage-dc.com
OpenAI Stargate WisconsinOpenAI0 MW1,300 MW by Dec 31 2028Utility

We Energies (WEC Energy Group) WEC

“The project is needed to reliably serve a load interconnection request by We Energies for a new large load addition in the Port Washington area and maintain the safe and reliable operation of ATC’s system.”

atcllc.com
OpenAI Stargate MilamOpenAI0 MW1,200 MW by Dec 31 2028Grid

ERCOT

“Milam County, TX (ERCOT)”

sec.gov
OpenAI Stargate MilamOpenAI0 MW1,200 MW by Dec 31 2028Site host

SB Energy (SoftBank Group) (has filed to list)

“On January 9, 2026, Milam County DC, LLC, one of our subsidiaries, as landlord, and Orion DC I, LLC, an affiliate of OpenAI, as tenant, entered into two separate triple-net data center lease agreements for data center buildings to be constructed in Milam County, Texas.”

sec.gov
OpenAI Stargate MilamOpenAI0 MW1,200 MW by Dec 31 2028Site host

SB Energy (SoftBank Group) (has filed to list)

“The Milam County leases cover approximately 753 MW of critical IT capacity across two buildings and have 15-year initial terms.”

753 MWCritical IT capacity under the two leasessec.gov
OpenAI Stargate MilamOpenAI0 MW1,200 MW by Dec 31 2028Generation

SB Energy (SoftBank Group) (has filed to list)

“As of the date of this prospectus, we had developed more than 1.3 GW of incremental power generation capacity in Milam County, and these co-located power assets are expected to serve a substantial portion of the data center campus’s total electricity needs.”

1,300 MWGeneration SB Energy has developed in the countysec.gov
OpenAI Stargate MilamOpenAI0 MW1,200 MW by Dec 31 2028Generation

SB Energy (SoftBank Group) (has filed to list)

“For Milam County, high-voltage interconnection is being delivered in phases: Phase 1-A (200 MW from Orion 1 via 34.5kV, targeted August 2026), Phase 1-B (230 MW from Orion 2 via 345kV, targeted December 2026), Phase 1-C (230 MW from Orion 3 via 345kV, targeted February 2027)”

sec.gov
Anthropic Barber LakeAnthropic0 MW300 MW by Apr 30 2027Grid

ERCOT

“Cipher Barber Lake has received approvals for 300 MW of interconnection without any restrictions on the load profile and has entered into agreements necessary to participate in the Electric Reliability Council of Texas”

sec.gov
Anthropic Barber LakeAnthropic0 MW300 MW by Apr 30 2027Site host

Cipher Digital CIFR

“with the 300 MW Barber Lake Facility for Fluidstack USA II Inc. (“Fluidstack”), expecting phased commencement in the fourth quarter of 2026”

300 MWSite capacity, all of it for Fluidstacksec.gov
Anthropic Barber LakeAnthropic0 MW300 MW by Apr 30 2027Site host

Cipher Digital CIFR

“Cipher Barber Lake has received approvals for 300 MW of interconnection without any restrictions on the load profile and has entered into agreements necessary to participate in the Electric Reliability Council of Texas”

300 MWSite capacity, all of it for Fluidstacksec.gov
Anthropic Barber LakeAnthropic0 MW300 MW by Apr 30 2027Site host

Cipher Digital CIFR

“244 MW of gross capacity will be allocated to Fluidstack in Barber Lake Phase I, and the remaining 56 MW will be allocated to Fluidstack in Barber Lake Phase II.”

300 MWSite capacity, all of it for Fluidstacksec.gov
Anthropic AbernathyAnthropic0 MW240 MW by Dec 31 2026—No power company read yet—
Anthropic River BendAnthropic0 MW330 MW by Dec 31 2027—No power company read yet—
EcoDataCenter 2Mistral0 MW67 MW by Jun 30 2028—No power company read yet—
Meta Bowling GreenMeta0 MW570 MW by Jan 1 2028—No power company read yet—
OpenAI Stargate LordstownOpenAI0 MW300 MW by Mar 1 2027—No power company read yet—
OpenAI Stargate ShackelfordOpenAI0 MW1,960 MW by Nov 11 2028—No power company read yet—
OpenAI Stargate UAEOpenAI0 MW1,400 MW by Jan 1 2028—No power company read yet—
New utility, regulator and company pages are read by handSites whose power companies don’t file with the SEC wait for a hand read
Epoch AI, AI data centersSites and power: CC BY 4.0, Epoch AI

Grid load where the lab sites are

Average demand on each grid that holds a lab site, from EIA. Grid demand, not data-center use.

Average demand on each grid that holds a lab site, the newest whole month against the same month a year before
Grid Lab sites Listed companies Month Average load vs a year before Source
ERCOTOpenAI Stargate Abilene, OpenAI Stargate Milam, Anthropic Barber LakeCIFR, GEVOct 202655,881 MW+1.5%api.eia.gov
PJMAnthropic-Amazon New CarlisleAEPOct 202686,463 MW+3.3%api.eia.gov
MISOMicrosoft Fairwater Wisconsin, Meta Hyperion, OpenAI Stargate Michigan, OpenAI Stargate WisconsinDTE, ETR, WECOct 202671,220 MW+2.6%api.eia.gov
NYISOAnthropic Lake MarinerWULFOct 202614,732 MW−1.6%api.eia.gov
APS (Arizona)Microsoft GoodyearPNWOct 20264,663 MW+11.0%api.eia.gov

ERCOT

−20.0%−2.5%+15.0%+32.5%+50.0%Jan 2019Dec 2020Nov 2022Nov 2024Oct 2026

PJM

−20.0%−2.5%+15.0%+32.5%+50.0%Jan 2019Dec 2020Nov 2022Nov 2024Oct 2026

MISO

−20.0%−2.5%+15.0%+32.5%+50.0%Jan 2019Dec 2020Nov 2022Nov 2024Oct 2026

NYISO

−20.0%−2.5%+15.0%+32.5%+50.0%Jan 2019Dec 2020Nov 2022Nov 2024Oct 2026

APS (Arizona)

−20.0%−2.5%+15.0%+32.5%+50.0%Jan 2019Dec 2020Nov 2022Nov 2024Oct 2026
Each lab site placed on a grid, with the page or EIA-861 row that places it
Site Labs Grid Placed by Source
Anthropic-Amazon New CarlisleAnthropicPJM

Indiana Michigan Power, in EIA-861

“2025, 9324, Indiana Michigan Power Co, A, Bundled, O, IN, Investor Owned, PJM”

eia.gov
OpenAI Stargate AbileneOpenAIERCOT

The page names its grid

“The Abilene data center connects directly to the ERCOT grid, allowing us to primarily draw from the region's robust and growing supply of renewable energy.”

crusoe.ai
Microsoft Fairwater WisconsinOpenAIMISO

We Energies, in EIA-861

“2025, 20847, Wisconsin Electric Power Co, A, Bundled, O, WI, Investor Owned, MISO”

eia.gov
Anthropic Lake MarinerAnthropicNYISO

The page names its grid

“The Lake Mariner Data Campus sources power from the NYISO Zone A grid, which is characterized by low-cost, low-carbon energy.”

sec.gov
Microsoft GoodyearOpenAIAPS (Arizona)

Arizona Public Service, in EIA-861

“2025, 803, Arizona Public Service Co, A, Bundled, O, AZ, Investor Owned, AZPS”

eia.gov
OpenAI Stargate MilamOpenAIERCOT

The page names its grid

“Milam County, TX (ERCOT)”

sec.gov
Anthropic Barber LakeAnthropicERCOT

The page names its grid

“Cipher Barber Lake has received approvals for 300 MW of interconnection without any restrictions on the load profile and has entered into agreements necessary to participate in the Electric Reliability Council of Texas”

sec.gov
Meta HyperionMetaMISO

Entergy Louisiana, in EIA-861

“2025, 11241, Entergy Louisiana LLC, A, Bundled, O, LA, Investor Owned, MISO”

eia.gov
OpenAI Stargate MichiganOpenAIMISO

DTE Electric, in EIA-861

“2025, 5109, DTE Electric Company, A, Bundled, O, MI, Investor Owned, MISO”

eia.gov
OpenAI Stargate WisconsinOpenAIMISO

We Energies, in EIA-861

“2025, 20847, Wisconsin Electric Power Co, A, Bundled, O, WI, Investor Owned, MISO”

eia.gov
Sites not placed yetPower made on site
Source: U.S. Energy Information Administration, EIA-930 and EIA-861

Large loads on ERCOT

Large load ERCOT has approved to energize, and the sum of each one’s monthly peak, from ERCOT’s monthly reports.

Approved Observed
0 MW2,500 MW5,000 MW7,500 MW10,000 MWApr 2025Aug 2025Jan 2026Jun 2026Oct 2026ApprovedObserved
Large load ERCOT has approved to energize and the sum of each approved load’s own monthly peak, from the newest report that states the month
Month Approved to energize Sum of monthly peaks Report
Oct 20269,456 MW5,115 MWercot.com
Sep 20269,456 MW4,132 MWercot.com
Aug 20269,456 MW4,316 MWercot.com
Jul 20269,456 MW4,370 MWercot.com
Jun 20268,926 MW3,966 MWercot.com
May 20269,062 MW4,145 MWercot.com
Apr 20269,012 MW4,006 MWercot.com
Mar 20269,042 MW4,008 MWercot.com
Feb 20269,043 MW4,037 MWercot.com
Jan 20268,787 MW4,049 MWercot.com
Dec 20257,502 MW3,827 MWercot.com
Nov 20257,502 MW3,960 MWercot.com
Oct 20257,502 MW4,126 MWercot.com
Aug 20257,502 MW3,694 MWercot.com
Jul 20257,150 MW3,820 MWercot.com
Jun 20256,874 MW3,605 MWercot.com
May 20256,874 MW3,489 MWercot.com
Apr 20256,779 MW3,691 MWercot.com
  • Queue: roughly 450 GW

    “The framework models roughly 450+ gigawatts (GW) of requested load and sorts each request into Base Load (mature, fully studied projects that receive their full allocation without the need for a restudy), Studied Load (projects ERCOT will study within Batch Zero to determine how much of that request can be reliably s erved by the grid), and Excluded Load (projects that ha ve not advanced far enough in the process and will be deferred to a later batch).”

    ercot.com
  • Queue: 445.8 GW by 2033

    “The Large Load Interconnection Queue continues to grow, with applications of large loads now totaling 445.8 gigawatts (GW) by 2033.”

    ercot.com
  • Observed energized: 5.9 GW

    “ERCOT has 5.9 GW of Observed Energized Large Loads, with another 3.2 GW of loads that have Approval to Energize but are not Operational.”

    ercot.com
  • Queue: more than 225 GW

    “There are more than 225 gigawatts (GW) of Large Loads currently seeking interconnection.”

    ercot.com
Source: ERCOT

Every site

99 sites in Epoch’s data as of Nov 28, largest first.

AI data centers tracked by Epoch AI, with estimated power and named users
Site Power H100e Owner Users Country
Colossus 21,246 MW1,475,493SpaceXAI #confidentAnthropic #confident, Cursor #confident, SpaceXAI #confident, Reflection #confidentUnited States
Anthropic-Amazon New Carlisle1,037 MW818,428Amazon #confidentAnthropic #confidentUnited States
OpenAI Stargate Abilene824 MW1,018,696Oracle #confidentOpenAI #confidentUnited States
Microsoft Fairwater Atlanta636 MW768,769Microsoft #confidentOpenAI #likely, Microsoft #likelyUnited States
DayOne Nusajaya473 MW583,837——Malaysia
Meta Prometheus471 MW536,343Meta #confidentMeta #confidentUnited States
DayOne Kempas422 MW480,639——Malaysia
Microsoft Fairwater Wisconsin369 MW445,680Microsoft #confidentOpenAI #likely, Microsoft #likelyUnited States
Google Pryor (North)368 MW636,685Google #confidentGoogle DeepMind #speculativeUnited States
Colossus 1340 MW275,796SpaceXAI #confidentAnthropic #confidentUnited States
Google New Albany333 MW323,901Google #confidentGoogle DeepMind #speculativeUnited States
Google Columbus303 MW331,986Google #confidentGoogle DeepMind #speculativeUnited States
Amazon Madison Mega Site284 MW214,348Amazon #confidentAnthropic #speculativeUnited States
CoreWeave Denton TX262 MW252,653CoreWeave #confidentOpenAI #likelyUnited States
Bridge Data Centres MY06243 MW221,052ByteDance #likelyByteDance #likelyMalaysia
QTS Richmond 1238 MW242,547——United States
Google Bristow238 MW209,861GoogleGoogle DeepMindUnited States
Google Council Bluffs (East)237 MW255,685Google #confidentGoogle DeepMind #speculativeUnited States
Google Omaha237 MW198,585Google #confidentGoogle DeepMind #speculativeUnited States
Google Papillion237 MW100,556Google #confidentGoogle DeepMind #speculativeUnited States
Amazon Ridgeland228 MW171,299Amazon #confidentAnthropic #speculativeUnited States
VNET Bayin Ulanqab221 MW122,789ByteDance #speculativeByteDance #speculativeChina
AWS New Albany213 MW201,112Amazon #confident—United States
Anthropic Lake Mariner210 MW292,830AI XPV Platform #confidentAnthropic #likelyUnited States
Microsoft Goodyear202 MW205,154Microsoft #confidentOpenAI #likely, Microsoft #confidentUnited States
Huawei Wuhu197 MW52,831Huawei #confident—China
Microsoft Project Osmium190 MW155,634Microsoft #confidentOpenAI #speculativeUnited States
Google Mesa183 MW289,540Google #confident—United States
QTS Richmond 2180 MW182,921——United States
Meta-QTS Hillsboro 2180 MW123,839Meta #likelyMeta #likelyUnited States
Meta Rosemount178 MW215,675Meta #confidentMeta #confidentUnited States
Meta Jeffersonville178 MW203,133Meta #confidentMeta #confidentUnited States
Meta Temple178 MW202,473Meta #confidentMeta #confidentUnited States
Huawei Horinger170 MW81,044Huawei #confident—China
Alibaba Zhangbei169 MW31,885Alibaba #confidentAlibaba #likelyChina
Google Storey County161 MW133,906Google #confidentGoogle DeepMind #speculativeUnited States
Google The Dalles154 MW175,341Google #confident—United States
Meta Montgomery153 MW174,517Meta #confidentMeta #confidentUnited States
Meta Kuna152 MW173,248Meta #confidentMeta #confidentUnited States
Meta Cheyenne152 MW172,815Meta #confidentMeta #confidentUnited States
Meta Huntsville146 MW166,761Meta #confidentMeta #confidentUnited States
QTS Richmond 3144 MW174,836——United States
Google Lincoln141 MW197,575Google #confident—United States
Google Lancaster137 MW130,369Google #confident—United States
Meta Eagle Mountain133 MW151,354Meta #confidentMeta #confidentUnited States
Coreweave Helios132 MW159,552CoreWeave #confidentOpenAI #speculativeUnited States
Meta Aiken129 MW147,044Meta #confidentMeta #confidentUnited States
Meta Los Lunas118 MW133,906Meta #confidentMeta #confidentUnited States
Envision Galaxy Ulanqab118 MW47,931——China
YTL Johor113 MW153,532——Malaysia
AWS Berwick108 MW81,354Amazon #confidentAnthropic #speculativeUnited States
Google Kansas City East105 MW202,628Google #confident—United States
Google Midlothian103 MW143,581Google #confident—United States
Google Waltham Cross88 MW123,800Google #confidentGoogle DeepMind #speculativeUnited Kingdom
Meta Gallatin87 MW99,545Meta #confidentMeta #confidentUnited States
STACK Infrastructure NVA0285 MW61,142——United States
CoreWeave Chester VA82 MW88,428CoreWeave #confidentOpenAI #speculativeUnited States
Meta Sarpy80 MW91,966Meta #confidentMeta #confidentUnited States
Google Arcola77 MW108,135Google #confident—United States
Google Red Oak77 MW108,135Google #confident—United States
Microsoft SAT4075 MW64,679Microsoft #confident—United States
Nebius Mantsala75 MW48,528Nebius #confidentMicrosoft #speculativeFinland
Oracle Batam72 MW84,386Oracle #likelyTencent #speculativeIndonesia
CoreWeave Ellendale ND68 MW93,482CoreWeave #confidentOpenAI #speculativeUnited States
CoreWeave Marble NC65 MW78,828CoreWeave #confidentOpenAI #speculativeUnited States
Stream Phoenix64 MW46,134——United States
Core42 Lake Mariner58 MW71,753Core42 #confidentG42 #likelyUnited States
Microsoft-Nebius New Jersey50 MW56,847Nebius #confidentMicrosoft #likelyUnited States
Microsoft SAT1447 MW45,174Microsoft #confident—United States
CoreWeave Norway42 MW50,773CoreWeave #confidentOpenAI #speculativeNorway
Southgate Melbourne41 MW46,488Firmus #confident—Australia
Start Campus Sines Data Campus33 MW31,834Nscale #confidentMicrosoft #confidentPortugal
Vantage TX132 MW38,706——United States
Mistral Bruyères-le-Châtel31 MW34,866Mistral AI #likelyMistral AI #confidentFrance
CoreWeave Dalton 1 & 228 MW32,239CoreWeave #confidentOpenAI #speculativeUnited States
xAI QTS Atlanta17 MW11,470SpaceXAI #confidentSpaceXAI #confidentUnited States
Nscale Keflavik5 MW5,821Nscale #confident—Iceland
Anthropic Abernathy0 MW0AI XPV Platform #confidentAnthropic #likelyUnited States
Anthropic Barber Lake0 MW0Cipher Mining #confidentAnthropic #confidentUnited States
Anthropic River Bend0 MW0AI XPV Platform #confidentAnthropic #confidentUnited States
CoreWeave Lancaster Greenfield site0 MW0CoreWeave #confidentOpenAI #speculativeUnited States
CoreWeave Muskogee OK0 MW0CoreWeave #confidentOpenAI #speculativeUnited States
Crusoe Abilene Expansion0 MW0Microsoft #confidentMicrosoft #likelyUnited States
EcoDataCenter 20 MW0Mistral AI #confidentMistral AI #confidentSweden
Goodnight0 MW0Google #speculativeGoogle DeepMind #speculativeUnited States
Google Cedar Rapids0 MW0Google #confidentGoogle DeepMind #speculativeUnited States
Google Fort Wayne0 MW0Google #confidentGoogle DeepMind #speculativeUnited States
Meta Bowling Green0 MW0Meta #confidentMeta #confidentUnited States
Meta Hyperion0 MW0Meta #confidentMeta #confidentUnited States
Microsoft Narvik Norway0 MW0Nscale #likelyMicrosoft #likelyNorway
OpenAI Stargate Lordstown0 MW0Softbank #confidentOpenAI #confidentUnited States
OpenAI Stargate Michigan0 MW0Oracle #confidentOpenAI #confidentUnited States
OpenAI Stargate Milam0 MW0Softbank #confidentOpenAI #confidentUnited States
OpenAI Stargate New Mexico0 MW0Oracle #confidentOpenAI #confidentUnited States
OpenAI Stargate Shackelford0 MW0Oracle #confidentOpenAI #confidentUnited States
OpenAI Stargate UAE0 MW0G42 #likelyOpenAI #confidentUnited Arab Emirates
OpenAI Stargate Wisconsin0 MW0Oracle #confidentOpenAI #confidentUnited States
QTS Cedar Rapids0 MW0Meta #speculativeMeta #speculativeUnited States
QTS Eagle Mountain0 MW0Meta #speculativeMeta #speculativeUnited States

Data from the last 90 days is CC BY 4.0. Older data is CC BY-NC 4.0, except what we published before 2026-11-04, which stays CC BY 4.0. How you can reuse it.