Data-center power per lab
Epoch AI’s estimate, for sites where Epoch names the lab a confident or likely user.
15,453 MW across 99 sites, 16.2M H100-equivalents, as of Epoch’s data on .
| Lab | Power | H100-equivalents | Sites shared | Largest |
|---|---|---|---|---|
| Anthropic | 2,833 MW | 2.86M | 7 (1) | Colossus 2, Anthropic-Amazon New Carlisle, Colossus 1 |
| Meta | 2,335 MW | 2.59M | 16 | Meta Prometheus, Meta-QTS Hillsboro 2, Meta Rosemount |
| OpenAI | 2,293 MW | 2.69M | 12 (3) | OpenAI Stargate Abilene, Microsoft Fairwater Atlanta, Microsoft Fairwater Wisconsin |
| xAI | 1,263 MW | 1.49M | 2 (1) | Colossus 2, xAI QTS Atlanta |
| Alibaba | 169 MW | 31.9K | 1 | Alibaba Zhangbei |
| Mistral | 31 MW | 34.9K | 2 | Mistral Bruyères-le-Châtel, EcoDataCenter 2 |
Who powers the lab sites
The utility, generator, equipment maker or site host for each lab site. Planned is Epoch’s furthest estimate.
| Ticker | Company | Role | Labs | Sites | Where |
|---|---|---|---|---|---|
| WEC | WEC Energy Group | Utility, Generation | OpenAI | 2 | Microsoft Fairwater Wisconsin, OpenAI Stargate Wisconsin |
| AEP | American Electric Power | Utility | Anthropic | 1 | Anthropic-Amazon New Carlisle |
| BE | Bloom Energy | Equipment | OpenAI | 1 | OpenAI Stargate New Mexico |
| CIFR | Cipher Digital | Site host | Anthropic | 1 | Anthropic Barber Lake |
| CORZ | Core Scientific | Site host | OpenAI | 1 | CoreWeave Denton TX |
| DTE | DTE Energy | Utility | OpenAI | 1 | OpenAI Stargate Michigan |
| ETR | Entergy | Utility | Meta | 1 | Meta Hyperion |
| GEV | GE Vernova | Equipment | OpenAI | 1 | OpenAI Stargate Abilene |
| PNW | Pinnacle West Capital | Utility | OpenAI | 1 | Microsoft Goodyear |
| WMB | Williams | Generation | Meta | 1 | Meta Prometheus |
| WULF | TeraWulf | Site host | Anthropic | 1 | Anthropic Lake Mariner |
| Site | Labs | Now | Planned | Role | Company | Stated by the page | Source |
|---|---|---|---|---|---|---|---|
| Colossus 2 | Anthropic, xAI | 1,246 MW | 2,395 MW by Mar 5 2027 | — | No power company read yet | — | |
| Anthropic-Amazon New Carlisle | Anthropic | 1,037 MW | 2,310 MW by Mar 17 2028 | Utility | Indiana Michigan Power (American Electric Power) AEP “Indiana Michigan Power (I&M), an American Electric Power (Nasdaq: AEP) company, has filed a joint settlement with the Indiana Office of Utility Consumer Counselor (OUCC), Amazon Web Services (AWS)” | aep.com | |
| OpenAI Stargate Abilene | OpenAI | 824 MW | — | Grid | ERCOT “The Abilene data center connects directly to the ERCOT grid, allowing us to primarily draw from the region's robust and growing supply of renewable energy.” | crusoe.ai | |
| OpenAI Stargate Abilene | OpenAI | 824 MW | — | Generation | Abilene DC 1 (Crusoe and Blue Owl joint venture) (private) “The Company was formed for the purpose of owning, developing, leasing, and operating a data center campus located in Abilene, Texas (the “Investment”), which is comprised of two buildings each containing four data halls, and a power station.” | sec.gov | |
| OpenAI Stargate Abilene | OpenAI | 824 MW | — | Site host | Lancium (private) “While the Investment is leased to a tenant, the tenant will be responsible for making monthly payments for power directly to Lancium.” | sec.gov | |
| OpenAI Stargate Abilene | OpenAI | 824 MW | — | Generation | Crusoe (private) “To ensure uninterrupted reliability and support grid stability for this critical AI infrastructure, we've strategically installed advanced natural gas turbines from GE Vernova.” | crusoe.ai | |
| OpenAI Stargate Abilene | OpenAI | 824 MW | — | Equipment | GE Vernova GEV “has been sourcing high-efficiency natural gas turbines from GE Vernova to provide this stability. Last December, the company ordered 10 LM2500XPRESS aeroderivative gas turbines to be installed at the data center it’s building outside of Abilene.” | gevernova.com | |
| OpenAI Stargate Abilene | OpenAI | 824 MW | — | Site host | Lancium (private) “In addition to the 1.2 GW grid interconnection, Lancium’s power plan for the site includes large-scale behind-the-meter battery storage and solar resources” | 1,200 MWGrid interconnection for the campus | crusoe.ai |
| OpenAI Stargate Abilene | OpenAI | 824 MW | — | Site host | Lancium (private) “Our Abilene campus features a 1.2GW interconnect, which has been fully approved by ERCOT and undergone a rigorous, formal review process in collaboration with transmission service providers.” | 1,200 MWGrid interconnection for the campus | lancium.com |
| Microsoft Fairwater Atlanta | OpenAI | 636 MW | — | — | No power company read yet | — | |
| Meta Prometheus | Meta | 471 MW | 1,328 MW by Jul 1 2028 | Generation | Will-Power OH (Williams) WMB “Will-Power OH, LLC will construct and operate the power plant on 20 acres within the New Albany International Business Park, and Sidecat, an affiliate of Meta Platforms, Inc., will consume the power.” | 200 MWCapacity of one Socrates plant | content.govdelivery.com |
| Meta Prometheus | Meta | 471 MW | 1,328 MW by Jul 1 2028 | Generation | Will-Power OH (Williams) WMB “Will-Power’s proposed Socrates North and South projects are advanced power generation facilities in New Albany, Ohio, spanning approximately 20 acres each. The project involves two separate power generation sites, with a combined generating capacity of 400 megawatts” | 400 MWCapacity of the two Socrates plants together | williams.com |
| Microsoft Fairwater Wisconsin | OpenAI | 369 MW | 2,715 MW by May 13 2028 | Utility | We Energies (WEC Energy Group) WEC “And our partnership with WE Energies ensures we will continually explore and add energy transmission, generation, and usage — under transparent tariffs that support grid reliability.” | blogs.microsoft.com | |
| Colossus 1 | Anthropic | 340 MW | — | — | No power company read yet | — | |
| CoreWeave Denton TX | OpenAI | 262 MW | 395 MW by May 31 2027 | Site host | Core Scientific CORZ “The 70 MW of additional contracted power at the Denton site increases the full critical IT load to approximately 260 MW. The agreement increases CoreWeave’s total contracted HPC infrastructure with Core Scientific to approximately 590 MW across six sites.” | 260 MWCritical IT load CoreWeave has contracted | investors.corescientific.com |
| CoreWeave Denton TX | OpenAI | 262 MW | 395 MW by May 31 2027 | Site host | Core Scientific CORZ “Under the original agreement, Core Scientific leased approximately 31 acres of city-owned land and had access to 297 megawatts (MW) of power. The Denton City Council's approval increases the leased land to approximately 78 acres and the Company's access to power to 394 MW.” | 394 MWPower Core Scientific can draw under its city agreements | investors.corescientific.com |
| Anthropic Lake Mariner | Anthropic | 210 MW | 441 MW by Mar 31 2027 | Grid | NYISO “The Lake Mariner Data Campus sources power from the NYISO Zone A grid, which is characterized by low-cost, low-carbon energy.” | sec.gov | |
| Anthropic Lake Mariner | Anthropic | 210 MW | 441 MW by Mar 31 2027 | Site host | TeraWulf WULF “with approximately 500 MW of aggregate gross capacity expected to be energized by early 2027, and planned expansion to approximately 750 MW, supported by an approved NYISO System Impact Study” | 500 MWCampus capacity expected to be energized by early 2027 | sec.gov |
| Anthropic Lake Mariner | Anthropic | 210 MW | 441 MW by Mar 31 2027 | Utility | New York Power Authority (state power authority) “Of the campus’s total power needs, 90 MW is allocated under an agreement with the New York Power Authority (“NYPA”) executed in February 2022” | 90 MWPower allocated under a 2022 agreement | sec.gov |
| Anthropic Lake Mariner | Anthropic | 210 MW | 441 MW by Mar 31 2027 | Site host | TeraWulf WULF “Under the Akela Fluidstack Leases, we will provide 378 MW of critical IT load at the Lake Mariner Data Campus.” | 378 MWCritical IT load leased to Fluidstack | sec.gov |
| Microsoft Goodyear | OpenAI | 202 MW | — | Utility | Arizona Public Service (Pinnacle West Capital) PNW “In Jan. 2022, we announced the need for a new double circuit 230kV power line to serve the Microsoft data center. The new 230kV line would connect the APS Runway Substation,” | aps.com | |
| Meta-QTS Hillsboro 2 | Meta | 180 MW | — | — | No power company read yet | — | |
| Meta Jeffersonville | Meta | 178 MW | — | — | No power company read yet | — | |
| Meta Rosemount | Meta | 178 MW | — | — | No power company read yet | — | |
| Meta Temple | Meta | 178 MW | — | — | No power company read yet | — | |
| Alibaba Zhangbei | Alibaba | 169 MW | — | — | No power company read yet | — | |
| Meta Montgomery | Meta | 153 MW | 465 MW by Feb 23 2027 | — | No power company read yet | — | |
| Meta Cheyenne | Meta | 152 MW | 249 MW by Feb 15 2027 | — | No power company read yet | — | |
| Meta Kuna | Meta | 152 MW | — | — | No power company read yet | — | |
| Meta Huntsville | Meta | 146 MW | — | — | No power company read yet | — | |
| Meta Eagle Mountain | Meta | 133 MW | — | — | No power company read yet | — | |
| Meta Aiken | Meta | 129 MW | — | — | No power company read yet | — | |
| Meta Los Lunas | Meta | 118 MW | 273 MW by Jan 1 2028 | — | No power company read yet | — | |
| Meta Gallatin | Meta | 87 MW | — | — | No power company read yet | — | |
| Meta Sarpy | Meta | 80 MW | — | — | No power company read yet | — | |
| Mistral Bruyères-le-Châtel | Mistral | 31 MW | — | — | No power company read yet | — | |
| xAI QTS Atlanta | xAI | 17 MW | — | — | No power company read yet | — | |
| Meta Hyperion | Meta | 0 MW | 2,786 MW by Dec 31 2029 | Utility | Entergy Louisiana (Entergy) ETR “Entergy Louisiana is pleased to announce plans to invest in modern, efficient generation facilities and robust transmission infrastructure to support the region and Meta’s data center representing a $10 billion in investment in Richland Parish.” | opportunitylouisiana.gov | |
| OpenAI Stargate New Mexico | OpenAI | 0 MW | 2,450 MW by Dec 31 2028 | Equipment | Bloom Energy BE “Project Jupiter in New Mexico, part of Bloom’s expanded partnership with Oracle, will be powered by up to 2.45 GW of Bloom fuel cell capacity.” | 2,450 MWFuel cell capacity, up to | bloomenergy.com |
| OpenAI Stargate Michigan | OpenAI | 0 MW | 1,383 MW by Dec 31 2028 | Utility | DTE Electric (DTE Energy) DTE “DTE negotiated its first hyperscale data center contracts to provide 1.4 gigawatts of load to power Oracle’s new data center in Saline Township, MI” | 1,400 MWLoad under DTE’s data-center contracts | sec.gov |
| OpenAI Stargate Wisconsin | OpenAI | 0 MW | 1,300 MW by Dec 31 2028 | Utility | We Energies (WEC Energy Group) WEC “Additionally, Vantage Data Centers is developing a large data center campus in Port Washington that is forecasted to add 1.3 GWs of demand through 2031.” | 1,300 MWDemand WEC forecasts the campus adds through 2031 | sec.gov |
| OpenAI Stargate Wisconsin | OpenAI | 0 MW | 1,300 MW by Dec 31 2028 | Utility | American Transmission Company (WEC Energy Group) WEC “In September 2025, ATC filed an application for a CPCN with the PSCW to construct the Ozaukee County Distribution Interconnection Project. This proposed project is an important part of our plan to serve the data center under construction in Port Washington, Wisconsin” | sec.gov | |
| OpenAI Stargate Wisconsin | OpenAI | 0 MW | 1,300 MW by Dec 31 2028 | Utility | We Energies (WEC Energy Group) WEC “Vantage is underwriting 100% of the power infrastructure investment with a dedicated electricity rate from WEC Energy Group utility We Energies.” | vantage-dc.com | |
| OpenAI Stargate Wisconsin | OpenAI | 0 MW | 1,300 MW by Dec 31 2028 | Generation | WEC Energy Group WEC “said Scott Lauber, president and CEO, WEC Energy Group. “Together with Vantage, we are adding nearly two gigawatts of new energy to the grid, 30% of which will be dedicated to the homes, farms and other businesses we serve today.” | vantage-dc.com | |
| OpenAI Stargate Wisconsin | OpenAI | 0 MW | 1,300 MW by Dec 31 2028 | Utility | We Energies (WEC Energy Group) WEC “The project is needed to reliably serve a load interconnection request by We Energies for a new large load addition in the Port Washington area and maintain the safe and reliable operation of ATC’s system.” | atcllc.com | |
| OpenAI Stargate Milam | OpenAI | 0 MW | 1,200 MW by Dec 31 2028 | Grid | ERCOT “Milam County, TX (ERCOT)” | sec.gov | |
| OpenAI Stargate Milam | OpenAI | 0 MW | 1,200 MW by Dec 31 2028 | Site host | SB Energy (SoftBank Group) (has filed to list) “On January 9, 2026, Milam County DC, LLC, one of our subsidiaries, as landlord, and Orion DC I, LLC, an affiliate of OpenAI, as tenant, entered into two separate triple-net data center lease agreements for data center buildings to be constructed in Milam County, Texas.” | sec.gov | |
| OpenAI Stargate Milam | OpenAI | 0 MW | 1,200 MW by Dec 31 2028 | Site host | SB Energy (SoftBank Group) (has filed to list) “The Milam County leases cover approximately 753 MW of critical IT capacity across two buildings and have 15-year initial terms.” | 753 MWCritical IT capacity under the two leases | sec.gov |
| OpenAI Stargate Milam | OpenAI | 0 MW | 1,200 MW by Dec 31 2028 | Generation | SB Energy (SoftBank Group) (has filed to list) “As of the date of this prospectus, we had developed more than 1.3 GW of incremental power generation capacity in Milam County, and these co-located power assets are expected to serve a substantial portion of the data center campus’s total electricity needs.” | 1,300 MWGeneration SB Energy has developed in the county | sec.gov |
| OpenAI Stargate Milam | OpenAI | 0 MW | 1,200 MW by Dec 31 2028 | Generation | SB Energy (SoftBank Group) (has filed to list) “For Milam County, high-voltage interconnection is being delivered in phases: Phase 1-A (200 MW from Orion 1 via 34.5kV, targeted August 2026), Phase 1-B (230 MW from Orion 2 via 345kV, targeted December 2026), Phase 1-C (230 MW from Orion 3 via 345kV, targeted February 2027)” | sec.gov | |
| Anthropic Barber Lake | Anthropic | 0 MW | 300 MW by Apr 30 2027 | Grid | ERCOT “Cipher Barber Lake has received approvals for 300 MW of interconnection without any restrictions on the load profile and has entered into agreements necessary to participate in the Electric Reliability Council of Texas” | sec.gov | |
| Anthropic Barber Lake | Anthropic | 0 MW | 300 MW by Apr 30 2027 | Site host | Cipher Digital CIFR “with the 300 MW Barber Lake Facility for Fluidstack USA II Inc. (“Fluidstack”), expecting phased commencement in the fourth quarter of 2026” | 300 MWSite capacity, all of it for Fluidstack | sec.gov |
| Anthropic Barber Lake | Anthropic | 0 MW | 300 MW by Apr 30 2027 | Site host | Cipher Digital CIFR “Cipher Barber Lake has received approvals for 300 MW of interconnection without any restrictions on the load profile and has entered into agreements necessary to participate in the Electric Reliability Council of Texas” | 300 MWSite capacity, all of it for Fluidstack | sec.gov |
| Anthropic Barber Lake | Anthropic | 0 MW | 300 MW by Apr 30 2027 | Site host | Cipher Digital CIFR “244 MW of gross capacity will be allocated to Fluidstack in Barber Lake Phase I, and the remaining 56 MW will be allocated to Fluidstack in Barber Lake Phase II.” | 300 MWSite capacity, all of it for Fluidstack | sec.gov |
| Anthropic Abernathy | Anthropic | 0 MW | 240 MW by Dec 31 2026 | — | No power company read yet | — | |
| Anthropic River Bend | Anthropic | 0 MW | 330 MW by Dec 31 2027 | — | No power company read yet | — | |
| EcoDataCenter 2 | Mistral | 0 MW | 67 MW by Jun 30 2028 | — | No power company read yet | — | |
| Meta Bowling Green | Meta | 0 MW | 570 MW by Jan 1 2028 | — | No power company read yet | — | |
| OpenAI Stargate Lordstown | OpenAI | 0 MW | 300 MW by Mar 1 2027 | — | No power company read yet | — | |
| OpenAI Stargate Shackelford | OpenAI | 0 MW | 1,960 MW by Nov 11 2028 | — | No power company read yet | — | |
| OpenAI Stargate UAE | OpenAI | 0 MW | 1,400 MW by Jan 1 2028 | — | No power company read yet | — |
Grid load where the lab sites are
Average demand on each grid that holds a lab site, from EIA. Grid demand, not data-center use.
| Grid | Lab sites | Listed companies | Month | Average load | vs a year before | Source |
|---|---|---|---|---|---|---|
| ERCOT | OpenAI Stargate Abilene, OpenAI Stargate Milam, Anthropic Barber Lake | CIFR, GEV | Oct 2026 | 55,881 MW | +1.5% | api.eia.gov |
| PJM | Anthropic-Amazon New Carlisle | AEP | Oct 2026 | 86,463 MW | +3.3% | api.eia.gov |
| MISO | Microsoft Fairwater Wisconsin, Meta Hyperion, OpenAI Stargate Michigan, OpenAI Stargate Wisconsin | DTE, ETR, WEC | Oct 2026 | 71,220 MW | +2.6% | api.eia.gov |
| NYISO | Anthropic Lake Mariner | WULF | Oct 2026 | 14,732 MW | −1.6% | api.eia.gov |
| APS (Arizona) | Microsoft Goodyear | PNW | Oct 2026 | 4,663 MW | +11.0% | api.eia.gov |
PJM
MISO
NYISO
APS (Arizona)
| Site | Labs | Grid | Placed by | Source |
|---|---|---|---|---|
| Anthropic-Amazon New Carlisle | Anthropic | PJM | Indiana Michigan Power, in EIA-861 “2025, 9324, Indiana Michigan Power Co, A, Bundled, O, IN, Investor Owned, PJM” | eia.gov |
| OpenAI Stargate Abilene | OpenAI | ERCOT | The page names its grid “The Abilene data center connects directly to the ERCOT grid, allowing us to primarily draw from the region's robust and growing supply of renewable energy.” | crusoe.ai |
| Microsoft Fairwater Wisconsin | OpenAI | MISO | We Energies, in EIA-861 “2025, 20847, Wisconsin Electric Power Co, A, Bundled, O, WI, Investor Owned, MISO” | eia.gov |
| Anthropic Lake Mariner | Anthropic | NYISO | The page names its grid “The Lake Mariner Data Campus sources power from the NYISO Zone A grid, which is characterized by low-cost, low-carbon energy.” | sec.gov |
| Microsoft Goodyear | OpenAI | APS (Arizona) | Arizona Public Service, in EIA-861 “2025, 803, Arizona Public Service Co, A, Bundled, O, AZ, Investor Owned, AZPS” | eia.gov |
| OpenAI Stargate Milam | OpenAI | ERCOT | The page names its grid “Milam County, TX (ERCOT)” | sec.gov |
| Anthropic Barber Lake | Anthropic | ERCOT | The page names its grid “Cipher Barber Lake has received approvals for 300 MW of interconnection without any restrictions on the load profile and has entered into agreements necessary to participate in the Electric Reliability Council of Texas” | sec.gov |
| Meta Hyperion | Meta | MISO | Entergy Louisiana, in EIA-861 “2025, 11241, Entergy Louisiana LLC, A, Bundled, O, LA, Investor Owned, MISO” | eia.gov |
| OpenAI Stargate Michigan | OpenAI | MISO | DTE Electric, in EIA-861 “2025, 5109, DTE Electric Company, A, Bundled, O, MI, Investor Owned, MISO” | eia.gov |
| OpenAI Stargate Wisconsin | OpenAI | MISO | We Energies, in EIA-861 “2025, 20847, Wisconsin Electric Power Co, A, Bundled, O, WI, Investor Owned, MISO” | eia.gov |
Large loads on ERCOT
Large load ERCOT has approved to energize, and the sum of each one’s monthly peak, from ERCOT’s monthly reports.
| Month | Approved to energize | Sum of monthly peaks | Report |
|---|---|---|---|
| Oct 2026 | 9,456 MW | 5,115 MW | ercot.com |
| Sep 2026 | 9,456 MW | 4,132 MW | ercot.com |
| Aug 2026 | 9,456 MW | 4,316 MW | ercot.com |
| Jul 2026 | 9,456 MW | 4,370 MW | ercot.com |
| Jun 2026 | 8,926 MW | 3,966 MW | ercot.com |
| May 2026 | 9,062 MW | 4,145 MW | ercot.com |
| Apr 2026 | 9,012 MW | 4,006 MW | ercot.com |
| Mar 2026 | 9,042 MW | 4,008 MW | ercot.com |
| Feb 2026 | 9,043 MW | 4,037 MW | ercot.com |
| Jan 2026 | 8,787 MW | 4,049 MW | ercot.com |
| Dec 2025 | 7,502 MW | 3,827 MW | ercot.com |
| Nov 2025 | 7,502 MW | 3,960 MW | ercot.com |
| Oct 2025 | 7,502 MW | 4,126 MW | ercot.com |
| Aug 2025 | 7,502 MW | 3,694 MW | ercot.com |
| Jul 2025 | 7,150 MW | 3,820 MW | ercot.com |
| Jun 2025 | 6,874 MW | 3,605 MW | ercot.com |
| May 2025 | 6,874 MW | 3,489 MW | ercot.com |
| Apr 2025 | 6,779 MW | 3,691 MW | ercot.com |
Queue: roughly 450 GW
“The framework models roughly 450+ gigawatts (GW) of requested load and sorts each request into Base Load (mature, fully studied projects that receive their full allocation without the need for a restudy), Studied Load (projects ERCOT will study within Batch Zero to determine how much of that request can be reliably s erved by the grid), and Excluded Load (projects that ha ve not advanced far enough in the process and will be deferred to a later batch).”
ercot.comQueue: 445.8 GW by 2033
“The Large Load Interconnection Queue continues to grow, with applications of large loads now totaling 445.8 gigawatts (GW) by 2033.”
ercot.comObserved energized: 5.9 GW
“ERCOT has 5.9 GW of Observed Energized Large Loads, with another 3.2 GW of loads that have Approval to Energize but are not Operational.”
ercot.comQueue: more than 225 GW
“There are more than 225 gigawatts (GW) of Large Loads currently seeking interconnection.”
ercot.com
Every site
99 sites in Epoch’s data as of Nov 28, largest first.
| Site | Power | H100e | Owner | Users | Country |
|---|---|---|---|---|---|
| Colossus 2 | 1,246 MW | 1,475,493 | SpaceXAI #confident | Anthropic #confident, Cursor #confident, SpaceXAI #confident, Reflection #confident | United States |
| Anthropic-Amazon New Carlisle | 1,037 MW | 818,428 | Amazon #confident | Anthropic #confident | United States |
| OpenAI Stargate Abilene | 824 MW | 1,018,696 | Oracle #confident | OpenAI #confident | United States |
| Microsoft Fairwater Atlanta | 636 MW | 768,769 | Microsoft #confident | OpenAI #likely, Microsoft #likely | United States |
| DayOne Nusajaya | 473 MW | 583,837 | — | — | Malaysia |
| Meta Prometheus | 471 MW | 536,343 | Meta #confident | Meta #confident | United States |
| DayOne Kempas | 422 MW | 480,639 | — | — | Malaysia |
| Microsoft Fairwater Wisconsin | 369 MW | 445,680 | Microsoft #confident | OpenAI #likely, Microsoft #likely | United States |
| Google Pryor (North) | 368 MW | 636,685 | Google #confident | Google DeepMind #speculative | United States |
| Colossus 1 | 340 MW | 275,796 | SpaceXAI #confident | Anthropic #confident | United States |
| Google New Albany | 333 MW | 323,901 | Google #confident | Google DeepMind #speculative | United States |
| Google Columbus | 303 MW | 331,986 | Google #confident | Google DeepMind #speculative | United States |
| Amazon Madison Mega Site | 284 MW | 214,348 | Amazon #confident | Anthropic #speculative | United States |
| CoreWeave Denton TX | 262 MW | 252,653 | CoreWeave #confident | OpenAI #likely | United States |
| Bridge Data Centres MY06 | 243 MW | 221,052 | ByteDance #likely | ByteDance #likely | Malaysia |
| QTS Richmond 1 | 238 MW | 242,547 | — | — | United States |
| Google Bristow | 238 MW | 209,861 | Google DeepMind | United States | |
| Google Council Bluffs (East) | 237 MW | 255,685 | Google #confident | Google DeepMind #speculative | United States |
| Google Omaha | 237 MW | 198,585 | Google #confident | Google DeepMind #speculative | United States |
| Google Papillion | 237 MW | 100,556 | Google #confident | Google DeepMind #speculative | United States |
| Amazon Ridgeland | 228 MW | 171,299 | Amazon #confident | Anthropic #speculative | United States |
| VNET Bayin Ulanqab | 221 MW | 122,789 | ByteDance #speculative | ByteDance #speculative | China |
| AWS New Albany | 213 MW | 201,112 | Amazon #confident | — | United States |
| Anthropic Lake Mariner | 210 MW | 292,830 | AI XPV Platform #confident | Anthropic #likely | United States |
| Microsoft Goodyear | 202 MW | 205,154 | Microsoft #confident | OpenAI #likely, Microsoft #confident | United States |
| Huawei Wuhu | 197 MW | 52,831 | Huawei #confident | — | China |
| Microsoft Project Osmium | 190 MW | 155,634 | Microsoft #confident | OpenAI #speculative | United States |
| Google Mesa | 183 MW | 289,540 | Google #confident | — | United States |
| QTS Richmond 2 | 180 MW | 182,921 | — | — | United States |
| Meta-QTS Hillsboro 2 | 180 MW | 123,839 | Meta #likely | Meta #likely | United States |
| Meta Rosemount | 178 MW | 215,675 | Meta #confident | Meta #confident | United States |
| Meta Jeffersonville | 178 MW | 203,133 | Meta #confident | Meta #confident | United States |
| Meta Temple | 178 MW | 202,473 | Meta #confident | Meta #confident | United States |
| Huawei Horinger | 170 MW | 81,044 | Huawei #confident | — | China |
| Alibaba Zhangbei | 169 MW | 31,885 | Alibaba #confident | Alibaba #likely | China |
| Google Storey County | 161 MW | 133,906 | Google #confident | Google DeepMind #speculative | United States |
| Google The Dalles | 154 MW | 175,341 | Google #confident | — | United States |
| Meta Montgomery | 153 MW | 174,517 | Meta #confident | Meta #confident | United States |
| Meta Kuna | 152 MW | 173,248 | Meta #confident | Meta #confident | United States |
| Meta Cheyenne | 152 MW | 172,815 | Meta #confident | Meta #confident | United States |
| Meta Huntsville | 146 MW | 166,761 | Meta #confident | Meta #confident | United States |
| QTS Richmond 3 | 144 MW | 174,836 | — | — | United States |
| Google Lincoln | 141 MW | 197,575 | Google #confident | — | United States |
| Google Lancaster | 137 MW | 130,369 | Google #confident | — | United States |
| Meta Eagle Mountain | 133 MW | 151,354 | Meta #confident | Meta #confident | United States |
| Coreweave Helios | 132 MW | 159,552 | CoreWeave #confident | OpenAI #speculative | United States |
| Meta Aiken | 129 MW | 147,044 | Meta #confident | Meta #confident | United States |
| Meta Los Lunas | 118 MW | 133,906 | Meta #confident | Meta #confident | United States |
| Envision Galaxy Ulanqab | 118 MW | 47,931 | — | — | China |
| YTL Johor | 113 MW | 153,532 | — | — | Malaysia |
| AWS Berwick | 108 MW | 81,354 | Amazon #confident | Anthropic #speculative | United States |
| Google Kansas City East | 105 MW | 202,628 | Google #confident | — | United States |
| Google Midlothian | 103 MW | 143,581 | Google #confident | — | United States |
| Google Waltham Cross | 88 MW | 123,800 | Google #confident | Google DeepMind #speculative | United Kingdom |
| Meta Gallatin | 87 MW | 99,545 | Meta #confident | Meta #confident | United States |
| STACK Infrastructure NVA02 | 85 MW | 61,142 | — | — | United States |
| CoreWeave Chester VA | 82 MW | 88,428 | CoreWeave #confident | OpenAI #speculative | United States |
| Meta Sarpy | 80 MW | 91,966 | Meta #confident | Meta #confident | United States |
| Google Arcola | 77 MW | 108,135 | Google #confident | — | United States |
| Google Red Oak | 77 MW | 108,135 | Google #confident | — | United States |
| Microsoft SAT40 | 75 MW | 64,679 | Microsoft #confident | — | United States |
| Nebius Mantsala | 75 MW | 48,528 | Nebius #confident | Microsoft #speculative | Finland |
| Oracle Batam | 72 MW | 84,386 | Oracle #likely | Tencent #speculative | Indonesia |
| CoreWeave Ellendale ND | 68 MW | 93,482 | CoreWeave #confident | OpenAI #speculative | United States |
| CoreWeave Marble NC | 65 MW | 78,828 | CoreWeave #confident | OpenAI #speculative | United States |
| Stream Phoenix | 64 MW | 46,134 | — | — | United States |
| Core42 Lake Mariner | 58 MW | 71,753 | Core42 #confident | G42 #likely | United States |
| Microsoft-Nebius New Jersey | 50 MW | 56,847 | Nebius #confident | Microsoft #likely | United States |
| Microsoft SAT14 | 47 MW | 45,174 | Microsoft #confident | — | United States |
| CoreWeave Norway | 42 MW | 50,773 | CoreWeave #confident | OpenAI #speculative | Norway |
| Southgate Melbourne | 41 MW | 46,488 | Firmus #confident | — | Australia |
| Start Campus Sines Data Campus | 33 MW | 31,834 | Nscale #confident | Microsoft #confident | Portugal |
| Vantage TX1 | 32 MW | 38,706 | — | — | United States |
| Mistral Bruyères-le-Châtel | 31 MW | 34,866 | Mistral AI #likely | Mistral AI #confident | France |
| CoreWeave Dalton 1 & 2 | 28 MW | 32,239 | CoreWeave #confident | OpenAI #speculative | United States |
| xAI QTS Atlanta | 17 MW | 11,470 | SpaceXAI #confident | SpaceXAI #confident | United States |
| Nscale Keflavik | 5 MW | 5,821 | Nscale #confident | — | Iceland |
| Anthropic Abernathy | 0 MW | 0 | AI XPV Platform #confident | Anthropic #likely | United States |
| Anthropic Barber Lake | 0 MW | 0 | Cipher Mining #confident | Anthropic #confident | United States |
| Anthropic River Bend | 0 MW | 0 | AI XPV Platform #confident | Anthropic #confident | United States |
| CoreWeave Lancaster Greenfield site | 0 MW | 0 | CoreWeave #confident | OpenAI #speculative | United States |
| CoreWeave Muskogee OK | 0 MW | 0 | CoreWeave #confident | OpenAI #speculative | United States |
| Crusoe Abilene Expansion | 0 MW | 0 | Microsoft #confident | Microsoft #likely | United States |
| EcoDataCenter 2 | 0 MW | 0 | Mistral AI #confident | Mistral AI #confident | Sweden |
| Goodnight | 0 MW | 0 | Google #speculative | Google DeepMind #speculative | United States |
| Google Cedar Rapids | 0 MW | 0 | Google #confident | Google DeepMind #speculative | United States |
| Google Fort Wayne | 0 MW | 0 | Google #confident | Google DeepMind #speculative | United States |
| Meta Bowling Green | 0 MW | 0 | Meta #confident | Meta #confident | United States |
| Meta Hyperion | 0 MW | 0 | Meta #confident | Meta #confident | United States |
| Microsoft Narvik Norway | 0 MW | 0 | Nscale #likely | Microsoft #likely | Norway |
| OpenAI Stargate Lordstown | 0 MW | 0 | Softbank #confident | OpenAI #confident | United States |
| OpenAI Stargate Michigan | 0 MW | 0 | Oracle #confident | OpenAI #confident | United States |
| OpenAI Stargate Milam | 0 MW | 0 | Softbank #confident | OpenAI #confident | United States |
| OpenAI Stargate New Mexico | 0 MW | 0 | Oracle #confident | OpenAI #confident | United States |
| OpenAI Stargate Shackelford | 0 MW | 0 | Oracle #confident | OpenAI #confident | United States |
| OpenAI Stargate UAE | 0 MW | 0 | G42 #likely | OpenAI #confident | United Arab Emirates |
| OpenAI Stargate Wisconsin | 0 MW | 0 | Oracle #confident | OpenAI #confident | United States |
| QTS Cedar Rapids | 0 MW | 0 | Meta #speculative | Meta #speculative | United States |
| QTS Eagle Mountain | 0 MW | 0 | Meta #speculative | Meta #speculative | United States |
Data from the last 90 days is CC BY 4.0. Older data is CC BY-NC 4.0, except what we published before 2026-11-04, which stays CC BY 4.0. How you can reuse it.